00-0232-EL-BLNDP&L/FOSTER-BATH02/01/2000 
01-0348-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INC. (ATSI)/BAY SHORE02/07/2001 
01-1164-EL-BLNDRESDEN ENERGY, LLC05/15/2001 
01-1751-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INC.07/10/2001 
01-3326-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INC./SOUTH AKRON-MOORE12/28/2001 
02-1969-EL-BLNASHTABULA EAST-ASHTABULA SOUTH 138 KV TRANMISSIONS LINE08/02/2002 
02-3340-EL-BLNFIRSTENERGY CORP./JOHNSON-USS KOBE PROJECT12/23/2002 
02-3372-EL-BLNFIRSTENERGY CORP-AVONDALE SUBSTATION-CITY OF AVON LAKE,OH-LORAIN CO.12/27/2002 
02-3373-EL-BLNFIRSTENERGY CORP./CONGRESS SUBSTATION/SUFFIELD TOWNSHIP/PORTAGE CO.12/27/2002 
03-0342-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INC.02/05/2003 
03-1496-EL-BLNAMERICAN ELECTRIC POWER NORTH CENTRAL CO-OP 138KV EXTENSION RISINGSUN07/08/2003 
03-1557-EL-BLNCINCINNATI GAS & ELECTRIC COMPANY07/17/2003 
03-2182-EL-BLNAMERICAN ELECTRIC POWER /DUBLIN-SAWMILL 138kV LINE10/27/2003 
03-2398-EL-BLNCOLUMBUS SOUTHERN POWER COMPANY12/12/2003 
04-0057-EL-BLNFIRSTENERGY CORPORATION01/15/2004 
04-0307-EL-BLNCINERGY CORP03/08/2004 
04-0512-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INCORPORATED (BURGER 138 KV TRANSMISSION)04/08/2004 
04-0548-EL-BLNFIRSTENERGY GENERATION CORP.04/15/2004 
04-0602-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INCORPORATED (OTTAWA TRANSMISSION SUBSTATION)04/23/2004 
04-0646-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INC. (JUNIPER-JENNINGS)04/30/2004 
04-0762-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INC. (BROOKSIDE-LEASIDE)05/19/2004 
04-1104-EL-BLNFIRST ENERGY CORP.07/13/2004 
05-1067-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INCORPORATED08/30/2005 
06-0096-EL-BLNAMERICAN TRANSMISSION SYSTEMS INC & CLEVELAND ELECTRIC ILLUMINATING CO01/23/2006 
06-0150-EL-BLNCINCINNATI GAS & ELECTRIC COMPANY01/27/2006 
06-0198-EL-BLNAMERICAN TRANSMISSION SYSTEM INCORPORATED/THE CLEVELAND ELECTRIC ILLUMINATING COMPANY01/31/2006 
06-0877-EL-BLNCOLUMBUS SOUTHERN POWER/CONESVILLE-TRENT 138kV LINE TAP/CENTERBURG STATION07/06/2006 
06-1067-EL-BLNAMERICAN TRANSMISSION SYSTEMS, INC/ FIRSTENERGY CORP./BURGER LONGVIEW 138KV TRANSMISSION LINE TAP TO BUCKEYE POWER /REEDSBURG SUBSTATION 08/28/2006 
06-1270-EL-BLNAMERICAN ELECTRIC POWER COMPANY AND COLUMBUS SOUTHERN POWER COMPANY/DON MARQUIS STATION PROJECT10/19/2006 
06-1385-EL-BLNFIRST ENERGY GENERATION CORP/SAMMIS NUMBER 5 CRANKING TRANSFORMER 345 KV SUBSTATION BUS EXTENSION11/22/2006 
06-1481-EL-BLNFIRST ENERGY CORP/CARLISLE-SHINROCK 138 KV TRANSMISSION LINE TAP12/19/2006 
06-1489-EL-BLNAEP/COLUMBUS SOUTHERN POWER / BIXBY-MARION & LSII 138KV LINE12/20/2006 
07-0072-EL-BLNFIRST ENERGY CORP-CRISSINGER-ROBERTS 138KV TRANSMISSION LINE RELOCATION ADJACENT TO CRISSINGER SUBSTATION PROJECT01/25/2007 
07-0099-EL-BLNCOLUMBUS SOUTHERN POWER COMPANY/BIXBY MARION 138K V LINE RELOCATION01/31/2007 
07-0103-EL-BLNFIRST ENERGY CORP-DALE-WEST CANTON 138 KV TRANSMISSION LINE NEW STRUCTURE ADJACENT TO DALE SUBSTATION PROJECT02/01/2007 
07-0145-EL-BLNAMERICAN TRANSMISSION SYSTEMS INC/ OHIO EDISON CO/THE CARLISLE-JOHNSON 138KV TRANSMISSION LINE TAP TO THE FIELDSTONE SUBSTATION PROJECT02/12/2007 
07-0159-EL-BLNOHIO POWER COMPANY DBA AMERICAN ELECTRIC POWER / HANTHORN ROAD G O ETHANOL 138KV LINE PROJECT02/15/2007 
07-0242-EL-BLNOHIO POWER COMPANY / PORTSMOUTH TRENTON 138KV LINE # 1 SERVICE TO THE DAYTON POWER & LIGHT MIDDLEBORO STATION03/02/2007 
07-0495-EL-BLNAMERICAN ELECTRIC POWER / HARRISON 138 KV PROJECT04/26/2007 
07-0615-EL-BLNAMERICAN TRANSMISSION SYSTEMS INCORPORATED/THE CLEVELAND ELECTRIC ILLUMINATING COMPANY05/22/2007 
07-0712-EL-BLNFIRSTENERGY SERVICES COMPANY/AMERICAN TRANSMISSION SYSTEMS INC (BAYSHORE-GM)06/18/2007 
07-0820-EL-BLNAMERICAN ELECTRIC POWER/ WARNER 138 KV EXTENSION SERVICE TO RTI07/18/2007 
07-1171-EL-BLNLETTER OF NOTIFICATION BURGER 138 KV TRANSMISSION LINES REPLACE STRUCTURE NEAR STATE ROUTE 147 IN BELMONT COUNTY11/07/2007 
07-1211-EL-BLNDUKE ENERGY LETTER OF NOTIFICATION O BANNONVILLE 138KV ELECTRIC TRANSMISSION LINE11/23/2007 
07-1266-EL-BLNPIERCE SUBSTATION TO BECKJORD 138 KV ELECTRIC TRANSMISSIONLINE PROJECT12/14/2007 
07-1320-EL-BLNAMERICAN TRANSMISSION SYSTEMS INCORPORATED AND OHIO EDISON COMPANY12/28/2007 
08-1086-EL-BLNAMERICAN TRANSMISSION SYSTEMS INC09/17/2008 
09-0053-EL-BLNCARROLL ELECTRIC COOPERATIVE 138 KV RADIAL TRANSMISSION LINE 01/22/2009 
09-0473-EL-BLNBEAVER/BROOKSIDE 138KV TRANSMISSION LINE TAP TO BUCKEYE POWER/ LORAIN/MEDINA RURAL ELECTRIC COOPERATIVES CAMDEN SUBSTATION06/04/2009 
10-0420-EL-BLNCITY OF HAMILTON SUBSTATION NO. 11 TO SUBSTATION NO. 10 138KV TRANSMISSION LINE 03/31/2010 
11-4934-EL-BLNLima - Sterling 138kV Line09/02/2011 
12-0308-EL-BLNGahanna - West Millersport 138 kV Circuit Project01/17/2012 
12-1637-EL-BLNAMERICAN TRANSMISSION SYSTEMS INC09/07/2012 
12-2216-EL-BLNMARYSVILLE STATION EXPANSION08/03/2012 
12-2222-EL-BLNHYATT-CORRIDOR 345 kV STRUCTURE REPLACEMENT PROJECT08/07/2012 
12-2397-EL-BLNINLAND-JORDAN Q11 AND Q14 138 KV TRANSMISSION LINE LOOPS TO CLINIC HOSPITAL SUBSTATION PROJECT08/29/2012 
12-2461-EL-BLNAMERICAN TRANSMISSION SYSTEMS INC09/12/2012 
12-2462-EL-BLNAMERICAN TRANSMISSION SYSTEMS INC09/12/2012 
12-2519-EL-BLNKIRK JUG 138 kV CIRCUIT PROJECT09/14/2012 
12-2630-EL-BLNAMERICAN TRANSMISSION SYSTEMS INCORPORATED/EAST AKRON-SAMMIS 138 KV TRANSMISSION LINE LOOP TO KNOX SUBSTATION09/28/2012 
12-2640-EL-BLNROCHELLE TO WHITTIER 138KV TRANSMISSION LINE PROJECT09/28/2012 
12-2666-EL-BLNDAVIS BESSE-HAYES 345 KV TRANSMISSION LINE CONSTRUCTION PROJECT10/04/2012 
12-2719-EL-BLNMIDDLETOWN COGENERATION STATION EXPANSION PROJECT10/15/2012 
12-2912-EL-BLNEAST AKRON-SAMMIS 138 KV TRANSMISSION LINE CONNECTION TO UTICA EAST OHIO MIDSTREAM SUBSTATION PROJECT11/05/2012 
12-2938-EL-BLNATSI/EVERGREEN/NILES 138KV TRANSMISSION LINE RECONDUCTOR PROJECT11/09/2012 
12-3031-EL-BLNAMERICAN TRANSMISSION SYSTEMS/NILES SALT SPRINGS 138 KV SECOND TRANSMISSION LINE11/19/2012 
12-3126-EL-BLNLEROY CENTER-NURSERY Q11 & Q12 138 KV DUAL TAP TO PAINESVILLE MUNI PROJECT12/03/2012 
12-3157-EL-BLNAVERY-GREENFIELD 138 KV TRANSMISSION LINE EXTENSION TO HAYES SUBSTATION12/07/2012 
12-3158-EL-BLNBEAVER-DAVIS BESSE #2 345 KV TRANSMISSION LINE EXTENSION TO HAYES SUBSTATION PROJECT12/07/2012 
12-3159-EL-BLNHAYES-GREENFIELD #2 138 KV TRANSMISSION LINE EXTENSION TO HAYES SUBSTATION12/07/2012 
12-3233-EL-BLNDELTA WAUSEON 138 KV TRANSMISSION LINE RELOCATE GUYING FOR NORTH STAR STEEL YORK PROJECT12/17/2012 
13-0013-EL-BLNOHIO CENTRAL SUBSTATION EXPANSION PROJECT01/09/2013 
13-0108-EL-BLNEAST AKRON-HANNA 138 KV TRANSMISSION LINE TAP TO OLD FORGE SUBSTATION01/07/2013 
13-0170-EL-BLNWEST CANTON 138 kV LINE01/28/2013 
13-0171-EL-BLNAEP OHIO TRANSMISSION COMPANY/DELAWARE 138KV LINE01/22/2013 
13-0191-EL-BLNHIGHLAND SHENANGO 345 KV TRANSMISSION LINE EXTENSION TO NILES SUBSTATION PROJECT01/11/2013 
13-0224-EL-BLNLEMOYNE MIDWAY 345 KV CHRYSLER LEVIS PARK 138 KV AND LEMOYNE MIDWAY 138 KV TRANSMISSION LINE EXTENSION TO DOWLING SUBSTATION PROJECT01/14/2013 
13-0341-EL-BLNEAST AKRON SAMMIS & LOWELLVILLE SAMMIS 138 KV RELOCATION01/31/2013 
13-0452-EL-BLNAEP OHIO TRANSMISSION COMPANY STEAMTOWN 138KV LOOP PROJECT02/28/2013 
13-0493-EL-BLNANGOLA EBER VULCAN 138 KV TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT02/21/2013 
13-0698-EL-BLNSOUTH CANTON/WEST CANTON 138 KV LINE PROJECT PHASE 103/26/2013 
13-0757-EL-BLNAEP OHIO TRANSCO/CANTON AREA IMPROVEMENTS PROJECT06/18/2013 
13-0834-EL-BLNCHAMBERLIN MANSFIELD 345 KV TRANSMISSION LINE LOOP TO HANNA SUBSTATION PROJECT04/15/2013 
13-1153-EL-BLNCHRYSLER MACLEAN 138 KV TRANSMISSION LINE SWITCH STRUCTURE REPLACEMENT PROJECT05/10/2013 
13-1247-EL-BLNGALION LEASIDE/GALION TO ONTARIO SEGMENT OF GALION LONGVIEW 138 kV TRANSMISSION LINE RECONDUCTORING PROJECT06/03/2013 
13-1248-EL-BLNONTARIO TO LONGVIEW SEGMENT GALION LONGVIEW 138 KV TRANSMISSION LINE RECONDUCTORING PROJECT06/03/2013 
13-1330-EL-BLNGROVES BEXLEY 138KV TRANSMISSION LINE REBUILD PROJECT06/13/2013 
13-1749-EL-BLNEVERGREEN-IVANHOE 138 KV TRANSMISSION LINE TAP TO OHIO STAR FORGE SUBSTATION 08/06/2013 
13-1800-EL-BLNALLEN JUNCTION LEMOYNE #209/26/2013 
13-2009-EL-BLNMelmore-Tiffin Center 138kV Transmission Line Project 10/29/2013 
13-2036-EL-BLNIn the Matter of the Letter of Notification of the Ohio Central 345kV Extension Project11/05/2013 
13-2163-EL-BLNLONDON-TANGY 69 kV TRANSMISSION LINE LOOP TO JEFFERSON INDUSTRIES SUBSTATION11/01/2013 
13-2329-EL-BLNBurger-Cloverdale #2 and #3 138 kV Transmission Line Reconductor Project12/30/2013 
13-2412-EL-BLNGavin 138kV Extension No. 2 Relocation Project12/30/2013 
14-0036-EL-BLNLowellville-Sammis 138 kV Transmission Line Tap to the Pennant Midstream Facility Project01/10/2014 
14-0037-EL-BLNToronto and Sammis Area 138 kV Transmission Line Rebuild and Reconnection Project01/10/2014 
14-0144-EL-BLNIn the Matter of the Letter of Notification of the Hocking-West Lancaster 138kV Rebuild Project03/20/2014 
14-0240-EL-BLNLemoyne-Midway 138 kV Transmission Line Tap to Home Depot Substation02/18/2014 
14-0470-EL-BLNBeaver-Black River 138 kV Transmission Line Reconductoring and Structure Replacement Project 04/15/2014 
14-0530-EL-BLNSummerfield-Texas Eastern Berne 138 kV Transmission Line Relocation and Installation of the Blue Racer Station Project04/16/2014 
14-0531-EL-BLNAEP Ohio Transmission Company/Miller Switch-East Amsterdam 138kV Transmission Line Rebuild Project 06/27/2014 
14-0684-EL-BLNSporn-Muskingum River 345 kV Transmission Line Rebuild Project 05/05/2014 
14-0750-EL-BLNBLUE RACER MIDSTREAM05/02/2014 
14-0786-EL-BLNBurger-Knox 138 kV Transmission Line Tap to New Stacy Substation Project05/22/2014 
14-0787-EL-BLNKilgore-Polo Road 138-kV Transmission Line Project 05/21/2014 
14-0904-EL-BLNSeaman Voltage Drop 138kV Transmission Line Improvement Project05/28/2014 
14-1072-EL-BLNHyatt 345-kV Transmission Line Extension Project07/31/2014 
14-1073-EL-BLNMuskingum River-Wolf Creek 138-kV Transmission Line Rebuild Project08/28/2014 
14-1107-EL-BLNHarding-Perry 345 kV Transmission Line Loop to, and Expansion of, the Leroy Center Substation Project12/01/2014 
14-1120-EL-BLNAEP Ohio Transmission Company/Panda Road 138-kV Transmission Line Extension Project06/27/2014 
14-1144-EL-BLNBurger-Knox 138 kV Transmission Line Tap to Polo Road Project07/03/2014 
14-1244-EL-BLNAllen Junction – East Fayette 138 kV Transmission Rebuild Project07/18/2014 
14-1302-EL-BLNQ-11-IN-CH 138kV Transmission Line Reconductor and Structure Replacement Project08/06/2014 
14-1309-EL-BLNWest Akron-Pleasant Valley East 138kV Transmission Line Tap to Bath Substation Project08/04/2014 
14-1346-EL-BLNChamberlin-West Akron 138 kV Transmission Line Tap to Sourek Substation08/29/2014 
14-1397-EL-BLNDon Marquis-Bixby 345-kV Transmission Line Prop Structure08/26/2014 
14-1579-EL-BLNNorth Medina-West Akron 138 kV Transmission Line Tap to Laurel Substation10/01/2014 
14-1692-EL-BLNSOUTH CENTRAL POWER COMPANY\STACY 138kV TRANSMISSION LINE 10/02/2014 
14-1768-EL-BLNSparrow 138kV Transmission Line Loop Project10/30/2014 
14-1819-EL-BLNNottingham-Freebyrd 138kV Transmission Line Project12/19/2014 
14-2129-EL-BLNEastlake-Lloyd 138 kV Transmission Line Structure Addition Project12/08/2014 
14-2130-EL-BLNMayfield-Northfield 138 kV Transmission Line Structure Replacement Project12/02/2014 
14-2131-EL-BLNInland-Harding 345 kV Transmission Line Structure Replacement Project12/08/2014 
14-2161-EL-BLNBabb-East Akron/Aetna (West Akron) 138kV Structure Replacement Project 12/05/2014 
15-0289-EL-BLNBlack River-Johnson No1 and No2 138kV Transmission Line Extensions to Lake Avenue Substation05/01/2015 
15-0324-EL-BLNDuke Energy Ohio 138 kV Transmission Line Tap to Enyart Substation02/23/2015 
15-0464-EL-BLNBlack River-Johnson No.2 138kV Transmission Line Re-conductor and Structure Replacement Project05/07/2015 
15-0681-EL-BLNDelano-Scioto Trail 138kV Transmission Line Rebuild Project10/07/2015 
15-0682-EL-BLNHarrison-Circleville 138kV Transmission Line Rebuild Project10/14/2015 
15-0854-EL-BLNBrookside-Henrietta 138 kV Switch Replacement Project05/11/2015 
15-1121-EL-BLNBlack River-Lorain 138 kV Transmission Line Loop to Charleston Substation Project09/17/2015 
15-1122-EL-BLNBayshore-Fostoria Central and Bayshore-Monroe 345kV Transmission Line Extensions to Lallendorf Substation Project07/01/2015 
15-1666-EL-BLNYager Transmission Station Project10/06/2015 
15-1734-EL-BLNYager-Azalea 138kV Transmission Line Project11/05/2015 
15-2036-EL-BLNRexford Extension 138kV Transmission Line Project12/18/2015 
15-2081-EL-BLNDelta-Wauseon 138 kV Transmission Line Tap to Nature Fresh Farms Project12/23/2015 
16-0020-EL-BLNPoston-Lick 138kV Transmission Line Rebuild Project05/23/2016 
16-0033-EL-BLNSouth Caldwell Station Expansion Project01/25/2016 
16-0074-EL-BLNTimber Switch-Haviland 138kV Transmission Line Rebuild Project02/26/2016 
16-0257-EL-BLN138 kV Transmission Line Loops to Yager Substation02/01/2016 
16-1180-EL-BLNBlack River-Lorain & Carlisle-Lorain 138 kV Transmission Lines Reconductor & Rebuild Project07/05/2016 
16-1486-EL-BLNPoston-Good Hope 138kV Transmission Line Rebuild Project08/18/2016 
16-1487-EL-BLNGood Hope-Harrison 138kV Transmission Line Rebuild Project08/18/2016 
16-1522-EL-BLNDelano-Scioto Trail 138kV Transmission Line Relocation Project07/11/2016 
16-1523-EL-BLNCorner-Parkersburg 138kV Transmission Line Rebuild Project07/11/2016 
16-1528-EL-BLNRutland Substation Expansion Project07/26/2016 
16-1530-EL-BLNWest Mount Vernon-Heading 138kV Transmission Line Rebuild Project09/21/2016 
16-1531-EL-BLNHeading-Fulton 138kV Transmission Line Rebuild Project09/21/2016 
16-1576-EL-BLNGable-S. Cadiz 138 kV Transmission Line Rebuild Project08/19/2016 
16-1609-EL-BLNGlencoe Station Expansion Project08/19/2016 
16-1690-EL-BLNAmlin-Cole 138 kV Transmission Line Project10/21/2016 
16-1759-EL-BLNDuke Energy Ohio, Inc., 5680 – 138kV Todhunter to Nickel08/19/2016 
16-1769-EL-BLNHarrison-Good Hope 138kV Transmission Line Rebuild Number 2 Project09/15/2016 
16-1770-EL-BLNPoston-Good Hope 138kV Transmission Line Rebuild Number 2 Project10/20/2016 
16-1774-EL-BLNFulton-Windfall 138 kV Switch 10/31/2016 
16-1775-EL-BLNWindfall Switch-North Waldo 138 kV Switch 11/02/2016 
16-1856-EL-BLNHerlan 138kV Substation Project 11/22/2016 
16-1981-EL-BLNBroadview Substation Expansion Project10/03/2016 
16-2032-EL-BLNHARDIN WIND LLC10/14/2016 
16-2282-EL-BLNClark-Urbana 138kV Loop to Broadview Substation12/30/2016 
17-0172-EL-BLNWaverly-Ware Road 138kV Transmission Line Project01/20/2017 
17-0632-EL-BLNLemaster-West Lancaster 138kV Transmission Line Extension Project04/04/2017 
17-0634-EL-BLNLemaster-Rosewood 138kV Transmission Line Extension Project04/04/2017 
17-0635-EL-BLNLemaster-Strouds Run 138kV Transmission Line Extension Project04/04/2017 
17-0733-EL-BLNGinger Switch Emergency Repair and Upgrade03/14/2017 
17-0804-EL-BLNAEP Ohio Transmission Company, Inc./Ironman Station 05/30/2017 
17-0805-EL-BLNRhodes Station Project 11/28/2017 
17-0806-EL-BLNHeppner Station Project 11/28/2017 
17-0807-EL-BLNRhodes-Heppner Switch 138kV Transmission Line Project10/24/2017 
17-0808-EL-BLNHeppner Switch-Lick 138kV Transmission Line Project10/24/2017 
17-0809-EL-BLNRoss-Heppner Switch 138kV Transmission Line Project03/28/2017 
17-0810-EL-BLNLamping Station Project07/07/2017 
17-0811-EL-BLNTidd-Wagenhals 138kV Transmission Line Extension Project08/10/2017 
17-0813-EL-BLNWare Road-Seaman 138kV Transmission Line Rebuild Project 05/05/2017 
17-0819-EL-BLNClean Energy Future - Trumbull, LLC03/23/2017 
17-1091-EL-BLNOhio River Partners Shareholder LLC / Monroe County04/18/2017 
17-1318-EL-BLNAEP Ohio Transmission Company, Inc./Carrollton-Sunnyside 138kV Transmission Line 06/26/2017 
17-1325-EL-BLNBabbitt Station Project05/25/2017 
17-1566-EL-BLNDowling-Midway 138 kV Transmission Line Reconductor Project07/19/2017 
17-1777-EL-BLNBlue Racer-Texas Eastern Berne 138kV Transmission Line Project09/14/2017 
17-1828-EL-BLNGuernsey Power Station, LLC Letter of Notification Application for Guernsey Power Station Electrical Interconnection 08/24/2017 
17-1952-EL-BLNNew Albany BOLD Transmission Line Project10/17/2017 
17-1953-EL-BLNHaviland-North Delphos 138kV Transmission Line Project09/27/2017 
17-2057-EL-BLNDuke Energy Ohio 3885 - 138kV East Provident Loop10/04/2017 
17-2109-EL-BLNTrimble 138 kV Transmission Line Extension10/13/2017 
17-2281-EL-BLNLemaster 138 kV Station Update11/01/2017 
17-2303-EL-BLNEAST KENTUCKY POWER COOPERATIVE 11/06/2017 
17-2363-EL-BLNKammer-Vassell 765kV Transmission Line Extension11/16/2017 
17-2386-EL-BLNClark-Urbana 138kV Loop Centerline Adjustment Project11/20/2017 
17-2437-EL-BLNLemaster-Harrison 138kV Transmission Line Extension Project Update12/05/2017 
17-2438-EL-BLNLemaster-West Lancaster 138kV Transmission Line Extension Project Update12/05/2017 
17-2439-EL-BLNLemaster-Lick 138kV Transmission Line Extension Project Update12/08/2017 
17-2440-EL-BLNLemaster-Rosewood 138kV Transmission Line Extension Project Update12/08/2017 
17-2441-EL-BLNLemaster-Strouds Run 138kV Transmission Line Extension Project Update12/08/2017 
17-2442-EL-BLNLemaster-Ross 138kV Transmission Line Extension Project Update12/05/2017 
17-2500-EL-BLNIn the Matter of the Application of Duke Energy Ohio, Inc. for a Letter of Notification for Duke Energy 5680-138kV Nickel to Warren Rebuild12/14/2017 
17-2505-EL-BLNSummerfield-Berne 138 kV Transmission Line Project12/20/2017 
18-0034-EL-BLNDevola Station Project01/03/2018 
18-0086-EL-BLNEast Springfield-London #2 138 kV Transmission Line Extensions to North Titus Substation Project01/12/2018 
18-0149-EL-BLNNewbery Station and Extension Project02/28/2018 
18-0156-EL-BLNGinger Switch Repair and Upgrade Project06/01/2018 
18-0226-EL-BLNClark-Greene 138 kV/Clark-East Springfield 138 kV T-Lines Rebuild Project02/20/2018 
18-0602-EL-BLN1. Dilles Bottom Station and George Washington-Dilles Bottom 138 k Transmission Line Project04/30/2018 
18-0603-EL-BLNDilles Bottom-FE Corridor 138 kV Transmission Line Project04/30/2018 
18-0872-EL-BLNAdjustment to Heppner Rhodes 138 kV Transmission Line Rebuild Project05/24/2018 
18-0906-EL-BLNEast Lima Station Expansion Project05/23/2018 
18-1170-EL-BLNShannon-Astor 138 kV Transmission Line Extension Project07/25/2018 
18-1182-EL-BLNGay-McComb 138kV Transmission Line Extension Project 07/25/2018 
18-1389-EL-BLNHoward-Fostoria and Howard-Bucyrus Center 138kV Transmission Line Extension Project09/21/2018 
18-1394-EL-BLNBayshore-Jeep #2 138kV Tap to Cliffs Natural Resources10/29/2018 
18-1395-EL-BLNBeaver-Black River 138kV T-Line Rebuild & Beaver-Johnson 138kV T-Line Partial Rebuild11/09/2018 
18-1637-EL-BLNGemini Station 138kV Substation Project11/13/2018 
18-1678-EL-BLNCrooksville-North Newark 138 kV Transmission Line Extension Project11/27/2018 
18-1681-EL-BLNChrysler-Maclean 138 kV Transmission Line Tap to First Solar Project11/29/2018 
18-1794-EL-BLNSeneca Wind, LLC Letter of Notification for Seneca Wind Gen-Tie, Seneca County, Ohio12/05/2018 
18-1800-EL-BLNDevola-Mill Creek 138kV Transmission Line Project12/14/2018 
18-1807-EL-BLNDuke Energy Ohio12/07/2018 
18-1857-EL-BLNAdjustment to Carrollton-Sunnyside 138kV Transmission Line Project 12/28/2018 
19-0040-EL-BLNAnguin Station Project 01/22/2019 
19-0043-EL-BLNGristmill-Gemini 138 kV Transmission Line Project01/22/2019 
19-0048-EL-BLNDUKE ENERGY OHIO GARVER SUBSTATION01/18/2019 
19-0049-EL-BLNGarver New Line Installation 01/18/2019 
19-0050-EL-BLNGarver to AK Steel01/18/2019 
19-0227-EL-BLNDuke Energy Ohio , Inc \ Blue Ash- Duneden02/05/2019 
19-0266-EL-BLNAnguin-Babbitt 138 kV Transmission Line Project 03/01/2019 
19-0393-EL-BLNVinton Solar Energy LLC/ Vinton Solar Energy Center Transmission Line.02/08/2019 
19-0455-EL-BLNEastlake-Leroy Center 138 kV Transmission Line Loops to New Ring Bus Projec03/01/2019 
19-0585-EL-BLN138 kV Darrow Substation Expansion04/04/2019 
19-0744-EL-BLNBethel-Sawmill 138 kV Transmission Line Rebuild Project03/28/2019 
19-0803-EL-BLNKirby-Roberts 138 kV Transmission Line Loop to Crissinger Substation Project04/03/2019 
19-0842-EL-BLNCorridor Station Expansion Project04/09/2019 
19-0951-EL-BLNAdjustment to Crooksville-North Newark 138 kV Transmission Line Extension Project04/30/2019 
19-0985-EL-BLNThe Former Burger 138 kV Transmission Lines Extension to Holloway Substation Project05/08/2019 
19-1177-EL-BLNBrim Sub Expansion Project06/03/2019 
19-1337-EL-BLNFostoria West End (AEP) -Lemoyne-West Fremont 138 kV Transmission Line and Woodville No. 2 substation upgrade project08/12/2019 
19-1471-EL-BLNIn the Matter of the Application of Duke Energy Ohio, Inc. for the Elmwood Place I-75 Widening08/01/2019 
19-1487-EL-BLNAEP Ohio Transmission Company Inc. 08/02/2019 
19-1489-EL-BLNAEP Ohio Transmission Company, Inc. 08/07/2019 
19-1571-EL-BLNAEP Ohio Transmission Company, Inc.08/12/2019 
19-1613-EL-BLNBarnesville-Summerfield 138kV Transmission Line Project08/21/2019 
19-1631-EL-BLNDayton Power and Light Bath-Trebein 138kV Transmission Line Reconductor09/27/2019 
19-1765-EL-BLNNapoleon-Richland-Stryker Open Arm Project09/20/2019 
19-1774-EL-BLNOhio Power Company09/12/2019 
19-1781-EL-BLNEast Lima-Maddox Creek 345kV Transmission Line Reconductoring Project09/17/2019 
19-1822-EL-BLNDayton Power and Light - Clay Substation Project10/31/2019 
19-1857-EL-BLNHanna-Newton Falls 138 kV Transmission Line Rebuild Project10/08/2019 
19-1939-EL-BLNPerry-Ashtabula-Erie W 345kV Transmission Line Rebuild & Ashtabula Substation Expansion11/14/2019 
19-1941-EL-BLNHutchings Tap-Middleboro Switch 138kV Line and Middleboro Switch-Clinton County (Duke) 138kV Line Project10/23/2019 
19-1974-EL-BLNBethel-Sawmill 138 kV Transmission Line Project (Brookside-Sawmill)11/05/2019 
19-1987-EL-BLNClinton County (Duke)-Hillsboro 138kV Line Project10/28/2019 
19-2119-EL-BLNBabbitt 345/138 kV Station Project12/18/2019 
19-2163-EL-BLNIn the Matter of the Duke Energy Ohio, Inc. Dicks Creek Generation Station and Substation Separation Project 12/27/2019 
20-0007-EL-BLNIn the Matter of the Duke Energy Ohio, Inc. Morgan Transmission Line Circuit Separation Project01/15/2020 
20-0013-EL-BLNNSG Glass North America Tap Project01/08/2020 
20-0134-EL-BLNIn the Matter of Duke Energy Ohio, Cumminsville II01/31/2020 
20-0346-EL-BLNIn the Matter of the Application of Duke Energy Ohio, Inc.- Port Union to Mulhauser02/13/2020 
20-0389-EL-BLNBethel-Sawmill 138 kV Transmission Line Project (Bethel-Brookside)03/17/2020 
20-0531-EL-BLNKirk-Jug Street 345 kV Extension Project03/03/2020 
20-0542-EL-BLNCulbertson 138kV Station Project 03/09/2020 
20-0583-EL-BLNHayden Transmission Station Expansion Project03/27/2020 
20-0788-EL-BLNGuernsey 765 kV Transmission Line Extension05/28/2020 
20-0946-EL-BLNAmlin-Dublin 138 kV Transmission Line Project05/26/2020 
20-0952-EL-BLNAEP Ohio Transmission Company Inc. Lockbourne 138 kV Station Project05/22/2020 
20-1019-EL-BLNCole – Amlin 138kV Transmission Line Relocation Project (Hayden Site Hardening)05/20/2020 
20-1026-EL-BLNSouth Canton 765kV Station Expansion05/26/2020 
20-1102-EL-BLNKammer-Ormet No. 1 and No. 2 138 kV Extension Project06/10/2020 
20-1176-EL-BLNHighland-GM 138 kV Transmission Line Loop to Magellan Substation Project 06/24/2020 
20-1223-EL-BLNHyatt – Delaware 138kV Rebuild Project07/15/2020 
20-1257-EL-BLNCorridor Station; 138kV Line Entrance Span Modifications Project07/15/2020 
20-1277-EL-BLNLicking Co-Op Extension – Apple Valley 138 kV Transmission Line Project08/17/2020 
20-1308-EL-BLNPoston-Elliott 138kV Structure Relocation Project08/10/2020 
20-1363-EL-BLNEber-Swanton 138 kV Second Tap to Johnson Controls Substation Project08/12/2020 
20-1432-EL-BLNAshtabula-Pinney Dock 138 kV Transmission Line Project08/27/2020 
20-1439-EL-BLNCulbertson 138kV Transmission Line Extension Project09/02/2020 
20-1452-EL-BLNLockbourne Extension 138 kV Transmission Line Project10/01/2020 
20-1459-EL-BLNAshland Substation and 138 kV Transmission Lines Structure Addition Project11/09/2020 
20-1495-EL-BLNSeaman-Adams 138 kV Transmission Line Rebuild Project09/23/2020 
20-1574-EL-BLNCole-Amlin 138 kV Transmission Line Relocation Project10/05/2020 
20-1575-EL-BLNFostoria-East Lima 138kV Transmission Line Cut-Ins Project10/09/2020 
20-1610-EL-BLNIn the Matter of the Duke Energy Ohio, Inc., 9787 GLT project11/04/2020 
20-1727-EL-BLNIn the Matter of the Interconnection Substation Operating Authority Transferred to AEP Ohio Transmission Company, Inc. in Case No. 09-479-EL-BGN11/19/2020 
20-1735-EL-BLNWindsor Junction-Tiltonsville 138 kV Conductor Project12/07/2020 
20-1778-EL-BLNIn the Matter of the Duke Energy Ohio, Inc. Pierce Transmission 4502 Line Relocation12/11/2020 
20-1784-EL-BLNHighland-Magellan No.2 138 kV Transmission Line12/11/2020 
21-0015-EL-BLNHighland-Magellan No.2 138 kV Transmission Line Project01/08/2021 
21-0018-EL-BLNDuke Energy Ohio, Inc. Miami Fort Tanners Creek Project01/20/2021 
21-0033-EL-BLNLaRue Extension 138 kV Transmission Line Project01/26/2021 
21-0111-EL-BLNBellefonte Extension 138kV Line05/19/2021 
21-0152-EL-BLNDayton Power and Light - Hutchings 138kV Reactor Expansion 03/08/2021 
21-0167-EL-BLNWest Moulton-Gemini 138 kV Transmission Line Project03/09/2021 
21-0173-EL-BLNWindsor Extension (OH) 138 kV Transmission Line Project02/22/2021 
21-0229-EL-BLNDuke Energy Ohio, Inc. Greendale Substation Expansion Project03/29/2021 
21-0265-EL-BLNAdjustment to Seaman-Adams 138 kV Line Rebuild Project03/25/2021 
21-0267-EL-BLNMill Creek-Riverview 138 kV Transmission Line Rebuild04/26/2021 
21-0268-EL-BLNHillsboro-Millbrook Park 138 kV Circuit Rebuild04/30/2021 
21-0329-EL-BLNIn the Matter of the Letter of Notification Application for Switchyard Infrastructure, Yellowbud Solar, LLC 04/07/2021 
21-0496-EL-BLNDayton Power and Light Sugarcreek-Normandy Circuit Addition07/15/2021 
21-0525-EL-BLNNorth Newark-Sharp Road 138 kV Transmission Line Rebuild 05/04/2021 
21-0590-EL-BLNSterling – Foundry Park 138kV Transmission Line Raise Project05/19/2021 
21-0667-EL-BLNKnox-Washington 138 kV Transmission Line Rebuild Project09/21/2021 
21-0679-EL-BLNClinton 345kV Expansion Project08/26/2021 
21-0770-EL-BLNHoward-Fostoria 138kV Transmission Line Adjustment Project07/14/2021 
21-0786-EL-BLNCyprus 138 kV Station Project07/12/2021 
21-0789-EL-BLNIn the Matter of the Letter of Notification of Long Ridge Energy Generation LLC to Amend a Certificate 07/09/2021 
21-0850-EL-BLNBixby-Shannon 138 kV Transmission Line Rebuild Project09/14/2021 
21-0852-EL-BLNCrooksville-North Newark 138 kV Transmission Line Adjustment Project 08/31/2021 
21-0860-EL-BLNSifford Station Project08/18/2021 
21-0878-EL-BLNCorridor Station; 138kV Line Entrance Span Modifications Project09/24/2021 
21-0892-EL-BLNWest Moulton 138 kV Station Expansion Project08/26/2021 
21-0900-EL-BLNTidd-Sunnyside 138 kV Line Rebuild09/01/2021 
21-0972-EL-BLNDayton Power and Light West Milton-Airport 138kV10/28/2021 
21-0973-EL-BLNDayton Power and Light Airport-Miami 138kV 10/28/2021 
21-1003-EL-BLNIn the Matter of the Letter of Notification Application of Cadence Solar Energy LLC to Construct the Cadence Solar Energy Transmission Line.09/23/2021 
21-1012-EL-BLNDelta-Wauseon 138 kV Transmission Line Tap to Winameg Area Substation11/04/2021 
21-1056-EL-BLNCyprus 138 kV Extension Project10/27/2021 
21-1083-EL-BLNInnovation 138 kV Station Project11/29/2021 
21-1084-EL-BLNArboles 138 kV Station Project12/13/2021 
21-1112-EL-BLNCrooksville-Philo South 138 kV Transmission Line Rebuild Project11/22/2021 
21-1114-EL-BLNAmlin-Dublin 138 kV Transmission Line Adjustment Project11/18/2021 
21-1174-EL-BLNIn the Matter of the Letter of Notification Application for Big Plain Solar, LLC11/12/2021 
21-1206-EL-BLNCrooksville-North Newark 138-kV Transmission Line Rebuild Project (Newark Center-Crooksville)12/02/2021 
21-1207-EL-BLNWindsor Extension 138 kV Transmission Line Adjustment Project12/01/2021 
21-1219-EL-BLNHillsboro-Marysville 138 kV Transmission Line Adjustment Project12/17/2021 
21-1237-EL-BLNMadison 345kV12/14/2021 
22-0007-EL-BLNLondon-Tangy 138 kV Transmission Line Tap to Mitchell Delivery Point Substation01/14/2022 
22-0010-EL-BLNHillsboro-Millbrook Park 138 kV Circuit Rebuild Adjustment Project01/18/2022 
22-0053-EL-BLNDelta-Wauseon 138 kV Transmission Line Tap to Nova Tube Steel Substation02/02/2022 
22-0058-EL-BLNConesville-Corridor 345 kV Transmission Line Adjustment Project02/07/2022 
22-0116-EL-BLNSouthwest Lima Station Expansion and Southwest Lima-West Moulton 138 kV Line Adjustment Project02/17/2022 
22-0122-EL-BLNIn the Matter of the Letter of Notification Application of Pleasant Prairie Solar Energy LLC to Construct the Pleasant Prairie Solar Energy Center Tra08/30/2022 
22-0139-EL-BLNDayton Power & Light - Amsterdam-W.Moulton 138kV Improvements05/12/2022 
22-0154-EL-BLNLima – Fort Wayne 138 kV Transmission Rebuild Project03/08/2022 
22-0253-EL-BLNWestfall Station Project07/11/2022 
22-0254-EL-BLNCyprus-Parsons 138 kV Transmission Line Project04/06/2022 
22-0285-EL-BLNKnox-Nottingham 138 kV Transmission Line Rebuild Project - Kilgore (Polo Road)-New Stacy Buc Segment 03/31/2022 
22-0447-EL-BLNArboles Station 138 kV Transmission Line Adjustments Project 06/13/2022 
22-0452-EL-BLNDuke Energy Ohio, Inc.05/25/2022 
22-0488-EL-BLNCosgray Station Project05/09/2022 
22-0562-EL-BLNRichland-East Leipsic 138 kV Transmission Line Rebuild Project06/16/2022 
22-0597-EL-BLNMidway-Richland-Wauseon 138 kV Transmission Line Three Terminal Line Elimination Project06/16/2022 
22-0633-EL-BLNHayden – Roberts 345 kV Transmission Line Cut-ins to Cosgray Station Project07/15/2022 
22-0695-EL-BLNBokes Creek Station Project07/28/2022 
22-0697-EL-BLNClean Energy Future–Trumbull, LLC Letter of Notification for the Trumbull Energy Center Electrical Interconnection07/13/2022 
22-0747-EL-BLNLeroy Center-Mayfield Q1 and Q2 138 kV Transmission Lines Partial Reconductor Project08/11/2022 
22-0752-EL-BLNLee Extension 138 kV Transmission Line Project08/03/2022 
22-0774-EL-BLNPhilo-Howard 138 kV Transmission Line Rebuild Project (Millwood-Ohio Central)08/11/2022 
22-0781-EL-BLNInnovation Extension 138 kV Project08/29/2022 
22-0799-EL-BLNBrie 138 kV Station Project09/01/2022 
22-0833-EL-BLNFranklin Substation and 138 kV Extension (AES Ohio)09/26/2022 
22-0834-EL-BLNAmsterdam Substation Expansion (AES Ohio)11/22/2022 
22-0835-EL-BLNSidney Substation Expansion (AES Ohio)10/25/2022 
22-0918-EL-BLNVine-City of Columbus West 138 kV Transmission Line Relocation Project Asset Ownership: Ohio Power Company 10/05/2022 
22-0919-EL-BLNIron Triangle Sw. – Loudon 138 kV Transmission Line Project10/24/2022 
22-0942-EL-BLNIn the Matter of Duke Energy Ohio, Inc.11/10/2022 
22-0946-EL-BLNAirport-Union 138kV Transmission Line Project (AES Ohio)10/25/2022 
22-0947-EL-BLNCreekside 138kV Transmission Line Project (AES Ohio)11/14/2022 
22-0950-EL-BLNCottrell North and South 138 kV Transmission Line Extensions Project11/30/2022 
22-0955-EL-BLNChenoweth Station and Chenoweth – Fox Squirrel 345kV Tie Line10/24/2022 
22-0956-EL-BLNIn the Matter of the Letter of Notification for the Application of AMP Transmission, LLC for a Certificate of Environmental Compatibility and Public N11/17/2022 
22-0964-EL-BLNCrooksville-North Newark 138kV Transmission Line Adjustment 11/16/2022 
22-0967-EL-BLNLakeview-Ottawa 138 kV Transmission Line Reconductor Project10/19/2022 
22-1026-EL-BLNCrooksville – Philo 138kV Transmission Circuit Rebuild Project (Cannelville – Philo)11/04/2022 
22-1029-EL-BLNAnguin-Brie 138 kV Transmission Line Project11/21/2022 
22-1030-EL-BLNLetter of Notification for the Nottingham Solar 138 kV Gen-Tie Transmission Line Project11/04/2022 
22-1067-EL-BLNKirk-Union Ridge Solar 138 kV Transmission Line Project11/23/2022 
22-1079-EL-BLNMadison 345kV Substation Project (AES Ohio)11/22/2022 
22-1087-EL-BLNSalt Creek - Holmesville 138 kV Transmission Line Project 12/01/2022 
22-1119-EL-BLNKileville Station and Kileville 138 kV Extension Project 12/01/2022 
22-1131-EL-BLNSidney-Franklin Honda 138kV Rebuild/Extension Project (AES Ohio)12/22/2022 
23-0028-EL-BLNGreen Chapel Station Project01/10/2023 
23-0040-EL-BLNShannon-Astor 138 kV Transmission Line Project01/17/2023 
23-0066-EL-BLNMadison to Fayette 345kV Transmission Line Project (AES Ohio)02/07/2023 
23-0067-EL-BLNFayette Substation and 138kV Extension Project (AES Ohio)06/08/2023 
23-0073-EL-BLNDuke Energy Ohio, Inc.03/09/2023 
23-0104-EL-BLNIn the Matter of the Letter of Notification Application for the Blossom Solar 138 kV Gen-Tie Transmission Line Project04/06/2023 
23-0123-EL-BLNFiddlestix Switch-Ilesboro South Central Power 138-kV Transmission Line Project02/13/2023 
23-0141-EL-BLNHolloway-Knox 138 kV Transmission Line Rebuild Project - Holloway Sub to Nottingham Sub Segment02/17/2023 
23-0256-EL-BLNColumbus Solar Park LLC Model Landfill Solar 138 kV Gen-Tie Transmission Line Project03/21/2023 
23-0260-EL-BLNKiser Substation Interconnection Project- AES Ohio05/25/2023 
23-0290-EL-BLNBadger Station Project06/14/2023 
23-0355-EL-BLNInnovation-Green Chapel 138 kV Transmission Line Project04/06/2023 
23-0462-EL-BLNLeroy Center-Mayfield Q3 and Q4 138kV Transmission Lines Reconductor Project06/16/2023 
23-0474-EL-BLNSouth Canton - Sunnyside 138 kV Transmission Line Project05/11/2023 
23-0475-EL-BLNSouth Canton - Torrey 138 kV Transmission Line Project05/11/2023 
23-0528-EL-BLNHayden – Roberts 345 kV Transmission Line Cut-ins to Cosgray Station (Adjustments) Project05/09/2023 
23-0531-EL-BLNJerome 138 kV Station Project05/11/2023 
23-0557-EL-BLNIn the Matter of the Letter of Notification Application of Cadence Solar Energy LLC to Construct the Cadence Solar Energy Center Transmission Line.05/18/2023 
23-0570-EL-BLNHedding Road Switch and West Mount Vernon-North Waldo 138 kV Relocation Project06/01/2023 
23-0583-EL-BLNSpickard Station and Hillsboro-Clinton 138 kV Cut-in Project07/18/2023 
23-0631-EL-BLNAnguin 138 kV Extension No. 2 and No. 3 Transmission Line Project 06/08/2023 
23-0656-EL-BLNWest Dover 138 kV Transmission Line Relocations Project06/14/2023 
23-0688-EL-BLNGreen Chapel Extension 138 kV Transmission Line Project 07/11/2023 
23-0691-EL-BLNBEACON STATION PROJECT06/22/2023 
23-0757-EL-BLNLetter of Notification of Clean Energy Future – Trumbull, LLC for the Trumbull Energy Center Electrical Interconnection 07/18/2023 
23-0797-EL-BLNCyprus 138 / 345 kV Station Expansion Project08/03/2023 
23-0836-EL-BLNHuntley 138 kV Extension Cut-in, Scherers Switch, and Scherers Switch-Alexander 138 kV Transmission Line Project 08/29/2023 
23-0850-EL-BLNPoth Extension East and West 138 kV Transmission Line Project09/15/2023 
23-0855-EL-BLNMadison to Fayette 345 kV Transmission Line Adjustment Project (South Section)09/11/2023 
23-0909-EL-BLNNew Camp Washington Substation and Transmission Line Installation 12/18/2023 
23-0953-EL-BLNAmerican Transmission Systems, Incorporated, Angola-Eber-Vulcan 138 kV Transmission Line Rebuild and Wentworth Substation Expansion Project 11/17/2023 
23-0985-EL-BLNElk Extension North 138kV Line Adjustment Project12/06/2023 
23-1009-EL-BLNKileville-Jerome 138 kV Transmission Line Project11/01/2023 
23-1013-EL-BLNKnox-Nottingham 138 kV Transmission Line Rebuild Project - New Stacy BUC to Nottingham Sub Segment10/31/2023 
23-1044-EL-BLNWaverly – Lick 138 kV Transmission Line Relocation 11/13/2023 
23-1045-EL-BLNConesville-Corridor 345 kV Transmission Line Adjustment Project (Bermuda and Curley Stations)11/16/2023 
23-1050-EL-BLNHayden-Roberts 345 kV Cut-in (Beacon Station) and Beacon-Darby 345 kV Tie Lines Project 11/15/2023 
23-1098-EL-BLNCeltic 345 kV Station Project12/11/2023 
24-0005-EL-BLNMacy 138 kV Station and Extension Project01/10/2024 
24-0014-EL-BLNVassell-Green Chapel 345 kV 01/04/2024 
24-0037-EL-BLNLetter of Notification for American Transmission Services, Incorporated’s 02/15/2024 
24-0076-EL-BLNFostoria-East Lima 138 kV Transmission Line Rebuild Project (East Lima – North Woodcock and New Liberty – West End Fostoria)02/02/2024 
24-0077-EL-BLNFostoria-East Lima 138 kV Transmission Line Rebuild Project (North Woodcock – New Liberty)02/02/2024 
24-0097-EL-BLNAdjustments to the Huntley 138 kV Extension Cut-in, Scherers Switch, and Scherers Switch-Alexander 138 kV Transmission Line Project03/19/2024 
24-0111-EL-BLNWest Watertown - Watertown 138 kV Transmission Line Project04/02/2024 
24-0115-EL-BLNKileville-Jerome 138 kV Transmission Line Adjustment Project02/08/2024 
24-0118-EL-BLNVassell-Curleys 345 kV Transmission Line Project 02/08/2024 
24-0175-EL-BLNCyprus 345 kV Extension Project03/08/2024 
24-0215-EL-BLNOPSB Aicholtz 04/18/2024 
24-0243-EL-BLNIn the Matter of the Letter of Notification of the Application by American Transmission Systems, Incorporated for the Darrow-Hudson East 138 kV Transm04/09/2024 
94-1778-EL-BLNOHIO EDISON/BEAVER-JOHNSON11/02/1994